KDE Energy Nederland is part of KDE Energy Europe and is established in Slochteren, province Groningen. The professional dedicated team works on the development of small and large scaled windenergy projects in the whole country. In this challenge, the team has full support of specialists in all legal, technical and financial aspects which occur all throughout the process of the projects.
Some of our projects:
-
Delfzijl Zuid: Project of 32 Enercon E70 turbines, with a total of 71.8MW. KDE Energy developed this project in a joint venture with Essent and Siemens.
-
Eemshaven: The biggest on-shore wind farm of the Netherlands with a total capacity of 255MW. The farm has several different turbines: 21 Vestas V90 turbines and 64 Enercon E82 turbines. KDE Energy developed this project in joint venture with Essent.
-
Afrikahaven: Windfarm in the harbour of Amsterdam developed and built by KDE Energy. De formal opening was done on the international Wind day in 2008, in presence of the minister of environment. The farm has 9 Vestas V90 turbines for a total capacity of 27MW.
Our KDE Energy team has as its members:
Frank Hoiting – Country Manager
Jeffrey Lapré – Project Manager
Judith Siebring - Communication Manager
Jack Roling – Project Developer
What are the different steps in a windfarm project in the Netherlands?
- Siteselection and prefaisability study
- Obtaining an exclusive partnership with the landowners
- Wind measurement campaign
- Obtaining all necessary consents
- Setting up the financing, procurement of windturbines and Project Engineering
- Building
- Commissioning, Operation & Maintenance
- Decommissioning